Pages

Showing posts with label Springer. Show all posts
Showing posts with label Springer. Show all posts

Wednesday, May 14, 2014

Results of The Plan


Gig went well & parties were good. Have to continue my front end.

The Plan

First I cut nylon bar with axle grinder (not best method, I soon noticed...). I burned my hand because of melting nylon. You can see how the bar has been melted in this picture. With cutting tool of lathe or with normal saw, I would have had better results. Bad thing is, that I don´t have any of those, so axle grinder it was...Then I bored bigger hole into nylon bar, because I only have 10mm drill bit and hole needed to be 13mm.



Now it fits.


Then I faced the nylon bar with lathe. Carbide bits make quite good surface even on nylon.


Here is the old one. It does not have any support for springs. This is made with file last summer.


Here is the final piece.


This way it sits at the bottom of the upper spring.


 Why I did not invent this before? I don´t know, but good that I did it now.


This is so great. I have other piece ready as well and front end feels much more stable in every manner now. I am anxious to see how it works when I drive. But I am really far away from that. Hope that I get this bike ready for this summer.


Lots of nylon waste



Saturday, May 10, 2014

Gig & Spacer

We have gig with F.T.W. Boogie Machine today at Viikinki MC. They have wedding party there and they celebrate their 21th anniversary also at same time. I am pretty sure that there will be One Helluva Party!

Gig starts at 22.30, so I have plenty of time to do other stuff before that. Started to do lower spacers for upper springs of springer. 

Here´s The Plan.






Royal Enfield Chopper in progress...Continues


I started to rebuild my springer. It has lots of free play here and there and those springer rods are bend little bit + they have bad threads. What I found from internet, were little bit too short for me also, so I decided to do them by myself. I will do Sugar Bear style rockers to springer too. More about that later.

Old ones


First I did some lathe job to axle steel bar


I read this trick, that you can put thread cutter directly to tailstock, tighten it and then just rotate chuck by had. Did not work for me, thread cutter does not stay at place.


I had to keep cutter still with other hand, add little bit pressure from back and rotate chuck by hand.


Worked! Only 3 more left. This is good method, since you get cutter straight to bar.


One side ready.


Then I did some spacer, so that the upper springs don´t move when tightened. First I cutted away some stuff from bigger nut with lathe.




Then took material out from too narrow spacer


Here they are, ready to be together. 



I am happy with results.



Fits fine. Also modified nut goes inside the spring, so it keeps it straight



There they are. Have to do something for the bottom end of the upper spring also, so it stays in line.


Here is pictures of my new hard tail. It is made from 25*3mm hydraulic tube & TIG welded together.

Yes. We did had a jig...


And here it is, all welded & ready to go with me. We did errors that much, that instead of using about 3 meters of tube, we used at least 5 meters! Errors happened and WILL happen in future also!